The compliance gap between a demo and a deployment
The distance from “it works on stage” to “it is legal on your floor”.

What a buyer should ask a factory to hand over, and when.
A demo is built to show what a robot can do. It is not built to show the paperwork behind it — and that paperwork is exactly what a regulator asks for first.
A stage run rarely carries the same declaration of conformity, risk assessment or technical file that the same machine needs on a working floor. None of that is a trick — a demo unit and a deployed unit are held to different standards by design.
The gap only becomes a problem when a buyer assumes the demo and the deployment are certified the same way. They are not, and finding that out after the pilot is the expensive way to learn it.
“A demo that looks finished and a demo that is legally finished are two different claims — only one of them comes with a file attached.”
Four documents cover most of what a buyer needs to see before a robot works alongside their staff.
The CE declaration against the directives that actually apply, the technical file behind it, a risk assessment that can be adapted to the buyer’s own site, and operator instructions in a language the buyer’s staff read — a factory that has done this before hands them over without friction.
A factory that stalls on any one of the four is telling a buyer something worth hearing before money changes hands, not after.
WHAT TO TAKE AWAY
Ask for the CE declaration and the directives it responds to, not just a certificate number.
A risk assessment written for another site does not transfer to yours without adaptation.
Operator instructions should arrive in a language your staff actually read.
Paperwork requested during selection is due diligence; requested after the pilot, it is a negotiation.
Timing changes what the paperwork costs an integrator or operator to obtain.
Ask for the safety file during selection and it is a checklist item, sitting alongside the technical evaluation. Ask for it after a client has already seen the pilot and it becomes a deadline-driven scramble that was never on anyone’s calendar.
The rule holds regardless of how good the demo looked: paperwork requested early is due diligence, and paperwork requested late is a negotiation conducted from a weaker position.
EDITORIAL RULE
Sourced or silent. Every figure on this page carries an attributed, dated source. Where we could not source a number, we left it out rather than estimate it.
SOURCES

A QUESTION
One person answers — from the first email to the room.
nh_alliance

The distance from “it works on stage” to “it is legal on your floor”.

The case for building a business around everything except the robot.

What the national automation targets mean on the ground.